Interactive · Saves progress · Printable · 44 tasks

Office Move Checklist:
Step-by-Step Relocation Guide

Five phases, 44 tasks, a pro tip for each one. From appointing your move coordinator to settling into your new space — nothing missed.

Quick overview

Office relocation checklist — at a glance

  • Start planning 2–3 months before your move date
  • Appoint a dedicated move coordinator on day one
  • Arrange IT infrastructure at least 4 weeks ahead
  • Notify employees and vendors at least 1 month before
  • Label every item with color-coded tags by room
  • Back up all data before equipment moves
  • Test internet and phones before move day
  • Photograph the old office before leaving
  • Update your address on every platform post-move
  • Collect employee feedback in week one
Phase 1 of 5

3 Months Before

0%
0/10
One person owns the entire process. Without this, tasks fall through the cracks.
Lock the date early — movers, IT, and landlord all need lead time.
Include movers, IT setup, furniture, downtime, and a 15% contingency buffer.
Check notice periods, dilapidation clauses, and deposit return conditions.
Measure rooms, check power points, assess natural light and ventilation.
Map team zones, meeting rooms, storage, and common areas before moving anything.
Compare full-service vs. self-managed. Always ask about insurance coverage.
Decide what moves, what gets sold or donated, and what needs replacing.
Internet, phone lines, server room, power capacity — confirm all before signing.
Moves are the best time to shred outdated documents and clear old equipment.
Phase 2 of 5

1 Month Before

0%
0/10
Verbal agreements are not enough. Get everything in writing.
Everyone needs to know where things go on day one.
Allow 2–4 weeks for delivery. Factor this into your move-in date.
Internet, servers, phone systems — book engineers well in advance.
Share timeline, new address, parking and transport info, and what they need to do.
Update delivery addresses with couriers, office supplies, and service providers.
Bank, HMRC, registered address, insurance, subscriptions — start the list now.
Set up forwarding for at least 12 months as a safety net.
Schedule phone and internet cutover for a low-traffic period — Friday evening is common.
Archive files, spare equipment, seasonal items — anything not needed daily.
Phase 3 of 5

1 Week Before

0%
0/8
Book elevator access at both buildings. Movers need clear, unobstructed access.
Color-coded labels by team or room. Number boxes and keep a master list.
No exceptions. Run a full backup and verify the restore process works.
Desks should be cleared by Thursday EOD if moving Friday or Saturday.
Power, water, heating — confirm connection dates. Arrive to a live building.
Find problems now, not on Monday morning. Have a mobile hotspot as backup.
Who does what, when to arrive, what to bring, what movers are handling.
Kettle, coffee, toilet paper, cleaning supplies, tools, extension leads, chargers.
Phase 4 of 5

Moving Day

0%
0/7
Split duties — one at origin, one at destination if possible.
Tick off equipment against your labeled list. Do not sign off until complete.
Stick copies of the floor plan at the entrance of the new office.
If there is a problem, you want to know at 10AM, not 8AM Monday.
Document condition for deposit return. Photograph walls, floors, and fixtures.
Lights off, windows closed, all keys handed over, nothing left behind.
Prioritize key team leads, reception, IT hub. Others can set up the next day.
Phase 5 of 5

After the Move

0%
0/9
Google Business Profile, website, LinkedIn, email signatures, contracts, stationery.
A short direct email. Do not assume they will find it themselves.
Damaged items, missing equipment, IT problems — deal with these in week one.
Check your policy for the claims window. Missing it forfeits your claim.
What felt right on paper may not work in practice. Adjust in week two.
A quick anonymous survey catches problems early and signals you care.
Secretary of State, bank, HMRC, insurers, pension providers — the full list.
Know your rights. Deposits must be returned within the legal timeframe.
What went well, what did not — your future self will thank you.
Cost guide

How much does it cost to move an office?

Office move costs are routinely underestimated. Here is a realistic breakdown — including what people usually forget.

Professional movers
$2,000–$15,000
Depends on team size, distance, and whether packing is included. Always get at least 3 quotes.
IT setup and cabling
$1,000–$8,000
Internet installation alone takes 2–4 weeks. Server room, cabling, and configuration add up fast.
New furniture
$500–$3,000/person
If current furniture stays or needs replacing. Allow for delivery lead time of 2–4 weeks.
Productivity downtime
Most underestimated
Lost output during disruption is often the biggest cost — and the hardest to quantify.
Utilities setup fees
$200–$1,000
Connection fees for electricity, gas, water at the new location.
Security deposit (new lease)
1–3 months rent
Usually required upfront. Plan cash flow — this comes before move day.

Want a detailed monthly workspace cost estimate for your new location?

Try the Cost Calculator →
What goes wrong

Common office moving mistakes to avoid

Most office move problems are predictable — and preventable with early action.

1

Starting too late

Planning should begin 2–3 months out. Starting 3 weeks before your date means you are already in recovery mode before you begin.

2

Underestimating IT complexity

Internet installation alone can take 2–4 weeks. Assuming you can sort it out on the day is the most common cause of extended downtime.

3

Moving without a floor plan

Movers will put things wherever without direction. A clear printed floor plan saves hours of rearranging after the fact.

4

Poor or no labeling

Unlabeled boxes make unpacking three times slower. Color-coded labels by team and room take 30 minutes and save hours.

5

Incomplete address updates

Companies update their website and forget everything else — bank, HMRC, insurers, pension providers, subscriptions.

6

No team communication plan

Employees and clients finding out about moves too late — or via rumor — causes unnecessary anxiety and operational mistakes.

7

Skipping the data backup

Equipment gets damaged in moves. A full, verified backup — both cloud and local — is non-negotiable before anything moves.

8

Not photographing the old office

Landlord deposit disputes are common. Photographs of every room before you leave are your best protection.

FAQ

Common questions about office relocation

Quick, direct answers based on real office moves.

Have a question? Ask us →

Planning should start 2–3 months before your target date. The physical move takes 1–3 days depending on team size. Allow 2–4 weeks post-move for IT stabilization, address updates, and layout adjustments. Total process: 3–4 months from decision to fully settled.